“I only have a few subcontractors that I highly recommend – who have done some of our complicated contemporary churches. We just completed a $14 million dollar church with a $1 million dollar AVL design and JFK was the reason that it was pulled off. The AVL design-build team was fired halfway through the project, which threw us a huge loop. These guys basically redesigned the system to make it work. Incredible.”
– Steve Barduson AIA, LEED AP, Barduson Architects