After purchasing Casa Grande Medical Center in 2014, Banner Health worked on bringing the facility up to its high standards. JFK conducted demolition and removed the existing 750kw generator, supply and installed two new 800kw generators, emergency paralleling switchgear, and upgraded one of the existing ATS switches.

  • Owner: Banner Health
  • Architect: CCRD Jared Mason
  • General Contractor: Kitchell Contractors